Lights: Yes Restrooms: Yes Free or Pay: Pay Inside or outside: Outside Are pads Required: Yes Riding Surface Material: Concrete Is there a ProShop on site?: Yes The skatepark is (approx.):
52,000 Date Opened: 2005-03-16
Photo Gallery Links, Related Articles, & Extra Notes:
The original plans that Site designed where thrown out and disregarded with in the first month and a half on the job. The crew did not work for site we worked for Mike Bell the developer that funded the park. The park was designed on the spot as it was built. Here are a list of the guys that deserve the credit.
Mike Bell - owner
Ryan "bones" Dempsy
Jon "food" Kosorek
Brian Sandlin
Tim Dunlava
James "Snowman" Snow
Matt Ballard
Carter
Danger
Eric Lee
Jeff Fontana
Ryan Welter
Big Island Jesse
Virgina Mark
Scooter